Granger Development Inc.
Leader conducted a combined Phase I/Phase II Environmental Site Assessment and a limitedSubsurface Investigationat a former K-Mart facility in Niatara Falls, New York. The specific scope of work conducted for the Phase I ESA was be based on the ASTM Environmental Site Assessment Standard E1527-13. The Phase II ESA was based on the findings of the Phase I ESA. Leader's limited Subsurface Investigation consisted of survey of excavation, document conditions and collect confirmatory samples within the excavation, if needed. Leader observed the open excavation and assessed potential impacts to subsurface soils using visual observations and photo-ion detection (“PID”) instrumentation.